Under construction
Colocation
Liquid cooling
Tier III

Retelit Avalon 4 Corsico

Retelit / Irideos · Avalon

Planned IT
20 MW
Free to lease
20 MW
$ / kW·mo
$174
White space
83k ft²

Inventory

0% occupied

Power

20 MWlive

20 MW to lease · 0 MW in use

White space

83k ft²total

83k ft² free · — occupied

7,742 m² · 7,742 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live—
Free to lease20 MW
Utility feed—
Campus / planned20 MW

Power cost

$174/kW·mo

18.6¢ industrial · 23.8¢ after PUE 1.28

Per MW·year
$2.1M
This site · 20 MW
$42M/yr
20 kW rack
$3,476/mo
3.2¢ cheapdear 22.4¢

5.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $35M/yr less.

Italy industrial / Milan · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2026
Renewable match
50%
Rack density
20 kW
Voltage
PUE
1.281.00 ideal · 1.60 typical
Power source
Terna / Enel. Dual MV inlets plus on-site diesel. Gas-marginal Italian grid.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

20 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Corsico, Lombardy, Italy

Corsico, Milan west

45.430°, 9.110° · Europe

Tenants / users

Hyperscale, cloud, MIX-adjacent wholesale

Notes

Avalon expansion west of Caldera. Parallel to a new Milan hall (2H 2026) and a Rome greenfield. Group climbing from 25 to 60 MW.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.