Related Digital The Barn (Stargate Michigan)
Related Digital · The Barn
- Planned IT
- —
- Free to lease
- —
- $ / kW·mo
- $74
- White space
- —
Power
Power cost
$74/kW·mo
7.8¢ industrial · 10.1¢ after PUE —
- Per MW·year
- $888k
- This site
- —
2.4× the cheapest market (Iceland Landsvirkjun).
Consumers Energy · utility tariff × PUE, not colo list price.
- Redundancy
- —
- Opened
- —
- Renewable match
- —
- Rack density
- —
- Voltage
- —
- PUE
- —1.00 ideal · 1.60 typical
- Power source
- DTE Energy special contracts (reported 1.4 GW, conditionally approved by the Michigan PSC); project-funded battery storage.
Cooling
Plant
Closed-loop liquid
Liquid
Deployed
Rack density
—
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Closed-loop cooling system per Related Digital / State of Michigan.
Network carriers
0No on-net carriers published.
On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
0No public-cloud on-ramp published.
Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Saline Township, Michigan, United States
Off Michigan Avenue, Saline Township, Washtenaw County, MI
42.125°, -83.839° · North America
Tenants / users
Oracle, OpenAI (Stargate)
Notes
More than 1 GW campus: three 550,000 sq ft single-story buildings (Related Digital, Oct 30 2025). Construction began winter 2025-26; two buildings framed and partly roofed by Sep 2026 (mlive). Planned MW left blank (announced only as more than 1 GW). Coordinates: OSM relation 903163 (place centroid, approximate). Sources: https://www.related.com/press-releases/2025-10-30/openai-oracle-and-related-digital-announce-stargate-data-center-site ; https://www.mlive.com/news/ann-arbor/2026/09/michigans-largest-data-center-project-near-saline-is-taking-shape.html
Compiled from public filings, operator pages, and reporting. Not an official operator specification.