Raya Data Center Cairo
Raya Data Center · Cairo
- IT live
- 10 MW
- Free to lease
- 1.8 MW
- $ / kW·mo
- $69
- White space
- 63k ft²
Inventory
82% occupiedPower
10 MWlive
1.8 MW to lease · 8.2 MW in use
White space
63k ft²total
11k ft² free · 51k ft² occupied
5,806 m² · 1,045 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 15 MW of the utility feed is cooling, conversion, and house load.
Power cost
$69/kW·mo
7¢ industrial · 9.5¢ after PUE 1.35
- Per MW·year
- $828k
- This site · 10 MW
- $8.3M/yr
- 10 kW rack
- $690/mo
2.2× the cheapest market (Iceland Landsvirkjun). Same IT load there is $4.5M/yr less.
Egypt EEHC · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2015
- Renewable match
- 20%
- Rack density
- 10 kW
- PUE
- 1.351.00 ideal · 1.60 typical
- Power source
- Egyptian Electricity Holding Company. Dual feeds plus on-site generation.
Cooling
Plant
Hybrid
Liquid
Not deployed
Rack density
10 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Indirect evaporative / IDEC, N+1. High-density liquid cabinets on request.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
3Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Cairo, Cairo, Egypt
Cairo, Egypt
30.060°, 31.220° · Africa
Tenants / users
Enterprise, government, cloud
Notes
Raya / Africa50 Cairo colo. Egypt's largest domestic operator campus.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.