Raxio TZ1 Dar es Salaam
Raxio Group · Dar es Salaam
- Planned IT
- 6 MW
- Free to lease
- 4.8 MW
- $ / kW·mo
- $128
- White space
- 42k ft²
Inventory
20% occupiedPower
6 MWlive
4.8 MW to lease · 1.2 MW in use
White space
42k ft²total
33k ft² free · 8,333 ft² occupied
3,871 m² · 3,097 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$128/kW·mo
13¢ industrial · 17.6¢ after PUE 1.35
- Per MW·year
- $1.5M
- This site · 6 MW
- $9.2M/yr
- 8 kW rack
- $1,025/mo
4.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $7M/yr less.
TANESCO · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2027
- Renewable match
- 20%
- Rack density
- 8 kW
- PUE
- 1.351.00 ideal · 1.60 typical
- Power source
- National grid plus on-site generators. N+1 ride-through.
Cooling
Plant
Air / CRAH
Liquid
Not deployed
Rack density
8 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Chilled-water CRAH, N+1. Liquid-ready suites offered on newer campus halls.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
2Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Dar es Salaam, Dar es Salaam, Tanzania
Dar es Salaam, Tanzania
-6.792°, 39.208° · Africa
Tenants / users
Enterprise, networks, TIX
Notes
Raxio Tanzania — next live market after the seven-country footprint.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.