Raxio CD1 Kinshasa
Raxio Group · Kinshasa
- IT live
- 4 MW
- Free to lease
- 0.5 MW
- $ / kW·mo
- $59
- White space
- 28k ft²
Inventory
88% occupiedPower
4 MWlive
0.5 MW to lease · 3.5 MW in use
White space
28k ft²total
3,333 ft² free · 24k ft² occupied
2,581 m² · 310 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 6 MW of the utility feed is cooling, conversion, and house load.
Power cost
$59/kW·mo
5.8¢ industrial · 8.1¢ after PUE 1.40
- Per MW·year
- $711k
- This site · 4 MW
- $2.8M/yr
- 8 kW rack
- $474/mo
1.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $1.3M/yr less.
SNEL hydro · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2024
- Renewable match
- 20%
- Rack density
- 8 kW
- PUE
- 1.401.00 ideal · 1.60 typical
- Power source
- National grid plus on-site generators. N+1 ride-through.
Cooling
Plant
Air / CRAH
Liquid
Not deployed
Rack density
8 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Chilled-water CRAH, N+1. Liquid-ready suites offered on newer campus halls.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
2Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Kinshasa, Kinshasa, Democratic Republic of the Congo
Kinshasa, DRC
-4.328°, 15.314° · Africa
Tenants / users
Enterprise, government, networks, KINIX
Notes
KINIX host from August 2026. Raxio's DRC hall.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.