Operational
Colocation
Air cooled
Tier III

Raxio CD1 Kinshasa

Raxio Group · Kinshasa

IT live
4 MW
Free to lease
0.5 MW
$ / kW·mo
$59
White space
28k ft²

Inventory

88% occupied

Power

4 MWlive

0.5 MW to lease · 3.5 MW in use

White space

28k ft²total

3,333 ft² free · 24k ft² occupied

2,581 m² · 310 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live4 MW
Free to lease0.5 MW
Utility feed10 MW
Campus / planned8 MW

About 6 MW of the utility feed is cooling, conversion, and house load.

Power cost

$59/kW·mo

5.8¢ industrial · 8.1¢ after PUE 1.40

Per MW·year
$711k
This site · 4 MW
$2.8M/yr
8 kW rack
$474/mo
3.2¢ cheapdear 22.4¢

1.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $1.3M/yr less.

SNEL hydro · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2024
Renewable match
20%
Rack density
8 kW
Voltage
PUE
1.401.00 ideal · 1.60 typical
Power source
National grid plus on-site generators. N+1 ride-through.

Cooling

Plant

Air / CRAH

Liquid

Not deployed

Rack density

8 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Chilled-water CRAH, N+1. Liquid-ready suites offered on newer campus halls.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

2

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Kinshasa, Kinshasa, Democratic Republic of the Congo

Kinshasa, DRC

-4.328°, 15.314° · Africa

Tenants / users

Enterprise, government, networks, KINIX

Notes

KINIX host from August 2026. Raxio's DRC hall.