Expanding
Colocation
Liquid cooling
Tier III

Qu Ottawa OTT3 Kanata

Qu Data Centres · Kanata North

IT live
2 MW
Free to lease
0.3 MW
$ / kW·mo
$93
White space
78k ft²

Inventory

87% occupied

Power

2 MWlive

0.3 MW to lease · 1.7 MW in use

White space

78k ft²total

1,625 ft² free · 77k ft² occupied

7,258 m² · 151 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live2 MW
Free to lease0.3 MW
Utility feed12.5 MW
Campus / planned10 MW

About 10.5 MW of the utility feed is cooling, conversion, and house load.

Power cost

$93/kW·mo

10¢ industrial · 12.8¢ after PUE 1.28

Per MW·year
$1.1M
This site · 2 MW
$2.2M/yr
10 kW rack
$934/mo
3.2¢ cheapdear 22.4¢

3.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $1.5M/yr less.

Hydro Ottawa / IESO · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2011
Renewable match
82%
Rack density
10 kW
PUE
1.281.00 ideal · 1.60 typical
Power source
Hydro Ottawa / Hydro One / IESO. Dual feeds plus on-site diesel. Federal-capital mix.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

10 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Ottawa, Ontario, Canada

Kanata North, Ottawa, ON

45.349°, -75.910° · North America

Tenants / users

Federal, defence tech, enterprise

Notes

Former Granite Networks, Rogers 2011. Tier III. 2 MW live, upgradeable to 10 MW. Kanata North tech park. Pair to Nepean OTT2.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.