Qu Calgary CGY3 Airdrie
Qu Data Centres · Airdrie
- IT live
- 9 MW
- Free to lease
- 1.2 MW
- $ / kW·mo
- $65
- White space
- 69k ft²
Inventory
87% occupiedPower
9 MWlive
1.2 MW to lease · 7.8 MW in use
White space
69k ft²total
7,312 ft² free · 61k ft² occupied
6,387 m² · 679 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 2 MW of the utility feed is cooling, conversion, and house load.
Power cost
$65/kW·mo
7¢ industrial · 9¢ after PUE 1.28
- Per MW·year
- $785k
- This site · 9 MW
- $7.1M/yr
- 10 kW rack
- $654/mo
2.2× the cheapest market (Iceland Landsvirkjun). Same IT load there is $3.8M/yr less.
AESO Airdrie · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2014
- Renewable match
- 30%
- Rack density
- 10 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- ENMAX / AESO. Dual feeds plus on-site diesel. Gas-marginal Alberta grid.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
10 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
7On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Airdrie, Alberta, Canada
34 Highland Park Way NE, Airdrie, AB T4A 2L5
51.292°, -113.982° · North America
Tenants / users
Enterprise, AI colo, energy DR
Notes
Largest Qu Alberta hall. 80,000 sq ft, 42,600 raised, Uptime Tier III, AI-ready. North of Calgary, dual-site to eStruxture Rocky View CAL-2/3 without being a 90 MW factory.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.