Under construction
Colocation
Liquid cooling
Tier III

QTS Suwanee

QTS (Blackstone) · Suwanee

QTS Suwanee facility
QTS · Source
Planned IT
100 MW
Free to lease
100 MW
$ / kW·mo
$78
White space
313k ft²

Inventory

0% occupied

Power

100 MWlive

100 MW to lease · 0 MW in use

White space

313k ft²total

313k ft² free · — occupied

29k m² · 29k m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live—
Free to lease100 MW
Utility feed—
Campus / planned100 MW

Power cost

$78/kW·mo

8.4¢ industrial · 10.8¢ after PUE 1.28

Per MW·year
$942k
This site · 100 MW
$94M/yr
30 kW rack
$2,355/mo
3.2¢ cheapdear 22.4¢

2.6× the cheapest market (Iceland Landsvirkjun). Same IT load there is $58M/yr less.

Georgia Power Suwanee · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2026
Renewable match
45%
Rack density
30 kW
PUE
1.281.00 ideal · 1.60 typical
Power source
Georgia Power. New 230 kV interconnection.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

30 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Suwanee, Georgia, United States

Suwanee, GA

34.051°, -84.071° · North America

Tenants / users

Hyperscale

Notes

Announced ~100 MW Atlanta-north campus. Complements live QTS Atlanta.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.