QTS Suwanee
QTS (Blackstone) · Suwanee

- Planned IT
- 100 MW
- Free to lease
- 100 MW
- $ / kW·mo
- $78
- White space
- 313k ft²
Inventory
0% occupiedPower
100 MWlive
100 MW to lease · 0 MW in use
White space
313k ft²total
313k ft² free · — occupied
29k m² · 29k m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$78/kW·mo
8.4¢ industrial · 10.8¢ after PUE 1.28
- Per MW·year
- $942k
- This site · 100 MW
- $94M/yr
- 30 kW rack
- $2,355/mo
2.6× the cheapest market (Iceland Landsvirkjun). Same IT load there is $58M/yr less.
Georgia Power Suwanee · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2026
- Renewable match
- 45%
- Rack density
- 30 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- Georgia Power. New 230 kV interconnection.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
30 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Suwanee, Georgia, United States
Suwanee, GA
34.051°, -84.071° · North America
Tenants / users
Hyperscale
Notes
Announced ~100 MW Atlanta-north campus. Complements live QTS Atlanta.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.