QTS Hillsboro
QTS (Blackstone) · Hillsboro

- IT live
- 32 MW
- Free to lease
- 3.8 MW
- $ / kW·mo
- $49
- White space
- 313k ft²
Inventory
88% occupiedPower
32 MWlive
3.8 MW to lease · 28.2 MW in use
White space
313k ft²total
15k ft² free · 298k ft² occupied
29k m² · 1,394 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 48 MW of the utility feed is cooling, conversion, and house load.
Power cost
$49/kW·mo
5.2¢ industrial · 6.7¢ after PUE 1.28
- Per MW·year
- $583k
- This site · 32 MW
- $19M/yr
- 22 kW rack
- $1,069/mo
1.6× the cheapest market (Iceland Landsvirkjun). Same IT load there is $7.2M/yr less.
PGE / BPA · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2021
- Renewable match
- 80%
- Rack density
- 22 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- Portland General Electric / BPA. Dual feeds. Hydro-backed Northwest grid.
Cooling
Plant
Free air
Liquid
Deployed
Rack density
22 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Hillsboro, Oregon, United States
Hillsboro, OR
45.523°, -122.990° · North America
Tenants / users
Hyperscale, cloud
Notes
Northwest QTS campus next to STACK Portland already in the index. BPA-cheap power.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.