QTS Eemshaven
QTS (Blackstone) · Eemshaven
- IT live
- 48 MW
- Free to lease
- 4.3 MW
- $ / kW·mo
- $101
- White space
- 500k ft²
Inventory
91% occupiedPower
48 MWlive
4.3 MW to lease · 43.7 MW in use
White space
500k ft²total
18k ft² free · 482k ft² occupied
46k m² · 1,672 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 72 MW of the utility feed is cooling, conversion, and house load.
Power cost
$101/kW·mo
12.4¢ industrial · 13.9¢ after PUE 1.12
- Per MW·year
- $1.2M
- This site · 48 MW
- $58M/yr
- 20 kW rack
- $2,028/mo
3.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $43M/yr less.
Netherlands north / Eemshaven · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2024
- Renewable match
- 90%
- Rack density
- 20 kW
- PUE
- 1.121.00 ideal · 1.60 typical
- Power source
- TenneT 380 kV Eemshaven energy port. Dual 380 kV plus on-site diesel. North Sea wind interconnectors and subsea cables.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
20 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
10On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
5Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Eemshaven, Groningen, Netherlands
Huibertgatweg 2, 9979 XZ Eemshaven
53.437°, 6.834° · Europe
Tenants / users
Hyperscale, cloud — Eemshaven energy port
Notes
Wholesale next to Google Eemshaven already in the index. TenneT 380 kV. One of two Dutch hyperscale zones still permitted. Blackstone QTS first Dutch campus.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.