Expanding
Colocation
Liquid cooling
Tier III

QTS Dallas

QTS (Blackstone) · Dallas

QTS Dallas facility
QTS · Source
IT live
40 MW
Free to lease
4.8 MW
$ / kW·mo
—
White space
342k ft²

Inventory

88% occupied

Power

40 MWlive

4.8 MW to lease · 35.2 MW in use

White space

342k ft²total

19k ft² free · 323k ft² occupied

32k m² · 1,742 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live40 MW
Free to lease4.8 MW
Utility feed87.5 MW
Campus / planned70 MW

About 47.5 MW of the utility feed is cooling, conversion, and house load.

Power cost

—/kW·mo

— industrial

Per MW·year
—
This site · 40 MW
—
3.2¢ cheapdear 22.4¢

Market industrial · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2013
Renewable match
40%
Rack density
22 kW
PUE
1.281.00 ideal · 1.60 typical
Power source
Oncor / ERCOT. Dual 138 kV or 34.5 kV plus on-site diesel.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

22 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Dallas, Texas, United States

Irving / Dallas, TX

32.899°, -96.999° · North America

Tenants / users

Hyperscale, cloud

Notes

Dallas QTS campus. ERCOT North. Complements CyrusOne DFW and Equinix DA.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.