QTS Cedar Rapids
QTS (Blackstone) · Cedar Rapids

- Planned IT
- 1 GW
- Free to lease
- 1 GW
- $ / kW·mo
- $52
- White space
- 2M ft²
Inventory
0% occupiedPower
1 GWlive
1 GW to lease · 0 MW in use
White space
2M ft²total
2M ft² free · — occupied
186k m² · 186k m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$52/kW·mo
6.2¢ industrial · 7.1¢ after PUE 1.15
- Per MW·year
- $625k
- This site · 1 GW
- $625M/yr
- 120 kW rack
- $6,246/mo
1.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $302M/yr less.
MidAmerican / MISO · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2028
- Renewable match
- 80%
- Rack density
- 120 kW
- PUE
- 1.151.00 ideal · 1.60 typical
- Power source
- MidAmerican Energy, wind-heavy Iowa grid.
Cooling
Plant
Direct-to-chip
Liquid
Deployed
Rack density
120 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Projected late-2027 / 2028 AI campus with campus-scale direct-to-chip liquid cooling.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Cedar Rapids, Iowa, United States
Cedar Rapids, IA
41.978°, -91.666° · North America
Tenants / users
Hyperscale AI
Notes
Epoch AI flags Cedar Rapids as a future record-scale site alongside Meta Hyperion.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.