Operational
Colocation
Liquid cooling
Tier III

QTS Ashburn Mega

QTS (Blackstone) · Ashburn

QTS Ashburn Mega facility
QTS · Source
IT live
90 MW
Free to lease
7.2 MW
$ / kW·mo
$70
White space
225k ft²

Inventory

92% occupied

Power

90 MWlive

7.2 MW to lease · 82.8 MW in use

White space

225k ft²total

18k ft² free · 207k ft² occupied

21k m² · 1,672 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live90 MW
Free to lease7.2 MW
Utility feed110 MW
Campus / planned150 MW

About 20 MW of the utility feed is cooling, conversion, and house load.

Power cost

$70/kW·mo

7.3¢ industrial · 9.6¢ after PUE 1.32

Per MW·year
$844k
This site · 90 MW
$76M/yr
40 kW rack
$2,814/mo
3.2¢ cheapdear 22.4¢

2.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $43M/yr less.

Northern Virginia / Dominion · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2019
Renewable match
20%
Rack density
40 kW
PUE
1.321.00 ideal · 1.60 typical
Power source
Dominion Energy and NOVEC.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

40 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hyperscale wholesale with liquid-ready halls for AI deployments.

Network carriers

8

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

5

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Ashburn, Virginia, United States

Ashburn, Loudoun County, VA

39.060°, -77.502° · North America

Tenants / users

Hyperscale, federal

Notes

QTS pipeline is among the largest of any colo REIT after the Blackstone take-private.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.