QScale Saint-Bruno-de-Montarville
QScale · Ecoparc Saint-Bruno
- Planned IT
- 80 MW
- Remaining
- 80 MW
- $ / kW·mo
- $43
- White space
- 160k ft²
Inventory
0% occupiedPower
80 MWcampus
80 MW pipeline · 0 MW in use
White space
160k ft²total
160k ft² free · — occupied
15k m² · 15k m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
Power cost
$43/kW·mo
5¢ industrial · 5.9¢ after PUE 1.18
- Per MW·year
- $517k
- This site · 80 MW
- $41M/yr
- 80 kW rack
- $3,446/mo
1.6× the cheapest market (Iceland Landsvirkjun). Same IT load there is $15M/yr less.
Hydro-Québec Rate L / South Shore · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2029
- Renewable match
- 99%
- Rack density
- 80 kW
- PUE
- 1.181.00 ideal · 1.60 typical
- Power source
- Hydro-Québec 120 kV private interconnection plus on-site diesel. Rate L industrial hydro.
Cooling
Plant
Direct-to-chip
Liquid
Deployed
Rack density
80 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Direct-to-chip cold plates and rear-door HX. Designed for 40 kW-plus AI racks.
Network carriers
7On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Saint-Bruno-de-Montarville, Quebec, Canada
Ecoparc de Saint-Bruno-de-Montarville, QC
45.525°, -73.339° · North America
Tenants / users
AI pipeline, Montréal-adjacent HPC
Notes
Second QScale campus on Montréal's south shore. Permitting. Dual-site with Lévis Q01 for a two-metro Québec AI platform.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.