Planned
Neocloud
Liquid cooling
Tier III

QScale Saint-Bruno-de-Montarville

QScale · Ecoparc Saint-Bruno

Planned IT
80 MW
Remaining
80 MW
$ / kW·mo
$43
White space
160k ft²

Inventory

0% occupied

Power

80 MWcampus

80 MW pipeline · 0 MW in use

White space

160k ft²total

160k ft² free · — occupied

15k m² · 15k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live—
Remaining80 MW
Utility feed—
Campus / planned80 MW

Power cost

$43/kW·mo

5¢ industrial · 5.9¢ after PUE 1.18

Per MW·year
$517k
This site · 80 MW
$41M/yr
80 kW rack
$3,446/mo
3.2¢ cheapdear 22.4¢

1.6× the cheapest market (Iceland Landsvirkjun). Same IT load there is $15M/yr less.

Hydro-Québec Rate L / South Shore · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2029
Renewable match
99%
Rack density
80 kW
PUE
1.181.00 ideal · 1.60 typical
Power source
Hydro-Québec 120 kV private interconnection plus on-site diesel. Rate L industrial hydro.

Cooling

Plant

Direct-to-chip

Liquid

Deployed

Rack density

80 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Direct-to-chip cold plates and rear-door HX. Designed for 40 kW-plus AI racks.

Network carriers

7

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Saint-Bruno-de-Montarville, Quebec, Canada

Ecoparc de Saint-Bruno-de-Montarville, QC

45.525°, -73.339° · North America

Tenants / users

AI pipeline, Montréal-adjacent HPC

Notes

Second QScale campus on Montréal's south shore. Permitting. Dual-site with Lévis Q01 for a two-metro Québec AI platform.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.