QScale Q01 Building B Lévis
QScale · Q01 Lévis
- Planned IT
- 60 MW
- Remaining
- 60 MW
- $ / kW·mo
- $38
- White space
- 120k ft²
Inventory
0% occupiedPower
60 MWcampus
60 MW pipeline · 0 MW in use
White space
120k ft²total
120k ft² free · — occupied
11k m² · 11k m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
Power cost
$38/kW·mo
4.8¢ industrial · 5.2¢ after PUE 1.08
- Per MW·year
- $454k
- This site · 60 MW
- $27M/yr
- 200 kW rack
- $7,569/mo
1.5× the cheapest market (Iceland Landsvirkjun). Same IT load there is $9.1M/yr less.
Hydro-Québec Rate L / Lévis · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2028
- Renewable match
- 99%
- Rack density
- 200 kW
- PUE
- 1.081.00 ideal · 1.60 typical
- Power source
- Hydro-Québec 120 kV private interconnection plus on-site diesel. Rate L industrial hydro.
Cooling
Plant
Direct-to-chip
Liquid
Deployed
Rack density
200 kW
H100-eq
6k
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Direct-to-chip cold plates and rear-door HX. Designed for 40 kW-plus AI racks.
Network carriers
7On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Lévis, Quebec, Canada
Q01 Campus Building B, Lévis, QC
46.739°, -71.287° · North America
Tenants / users
GB300-class AI, sovereign HPC
Notes
C$700 million, 60 MW IT. Ground broken June 2026. Cabinets 600 kW-plus. Pair to Building A. Third Lévis phase (~70 MW) still seeking a Hydro-Québec block.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.