Under construction
Neocloud
Liquid cooling
Tier III

QScale Q01 Building B Lévis

QScale · Q01 Lévis

Planned IT
60 MW
Remaining
60 MW
$ / kW·mo
$38
White space
120k ft²

Inventory

0% occupied

Power

60 MWcampus

60 MW pipeline · 0 MW in use

White space

120k ft²total

120k ft² free · — occupied

11k m² · 11k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live—
Remaining60 MW
Utility feed—
Campus / planned60 MW

Power cost

$38/kW·mo

4.8¢ industrial · 5.2¢ after PUE 1.08

Per MW·year
$454k
This site · 60 MW
$27M/yr
200 kW rack
$7,569/mo
3.2¢ cheapdear 22.4¢

1.5× the cheapest market (Iceland Landsvirkjun). Same IT load there is $9.1M/yr less.

Hydro-Québec Rate L / Lévis · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2028
Renewable match
99%
Rack density
200 kW
PUE
1.081.00 ideal · 1.60 typical
Power source
Hydro-Québec 120 kV private interconnection plus on-site diesel. Rate L industrial hydro.

Cooling

Plant

Direct-to-chip

Liquid

Deployed

Rack density

200 kW

H100-eq

6k

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Direct-to-chip cold plates and rear-door HX. Designed for 40 kW-plus AI racks.

Network carriers

7

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Lévis, Quebec, Canada

Q01 Campus Building B, Lévis, QC

46.739°, -71.287° · North America

Tenants / users

GB300-class AI, sovereign HPC

Notes

C$700 million, 60 MW IT. Ground broken June 2026. Cabinets 600 kW-plus. Pair to Building A. Third Lévis phase (~70 MW) still seeking a Hydro-Québec block.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.