QScale Q01 Building A Lévis
QScale · Q01 Lévis
- IT live
- 42 MW
- Remaining
- 40 MW
- $ / kW·mo
- $39
- White space
- 204k ft²
Inventory
51% occupiedPower
82 MWcampus
40 MW to commission · 42 MW in use
White space
398k ft²total
194k ft² free · 204k ft² occupied
37k m² · 18k m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
About 60 MW of the utility feed is cooling, conversion, and house load.
Power cost
$39/kW·mo
4.8¢ industrial · 5.3¢ after PUE 1.10
- Per MW·year
- $463k
- This site · 42 MW
- $19M/yr
- 80 kW rack
- $3,084/mo
1.5× the cheapest market (Iceland Landsvirkjun). Same IT load there is $6.5M/yr less.
Hydro-Québec Rate L / Lévis · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2023
- Renewable match
- 99%
- Rack density
- 80 kW
- PUE
- 1.101.00 ideal · 1.60 typical
- Power source
- Hydro-Québec 120 kV private interconnection plus on-site diesel. Rate L industrial hydro.
Cooling
Plant
Direct-to-chip
Liquid
Deployed
Rack density
80 kW
H100-eq
4k
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
OCP Ready liquid. Waste-heat recovery to greenhouse agriculture. 600 kW-class cabinets on Building B.
Network carriers
7On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Lévis, Quebec, Canada
Q01 Campus, Lévis, QC G7A 5M9
46.738°, -71.288° · North America
Tenants / users
Sovereign AI, HPC colo, Canadian compute
Notes
First OCP Ready colo in Canada. DCD North American Project of the Year 2023. Goldman Sachs majority 2026. 142 MW campus end-state across 313,000 sq ft. Heat reuse, not a carrier hotel.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.