Meta Prometheus
Meta · New Albany Campus
- IT live
- 562 MW
- Remaining
- 138 MW
- $ / kW·mo
- $53
- White space
- 1.1M ft²
Inventory
80% occupiedPower
700 MWcampus
138 MW to commission · 562 MW in use
White space
1.4M ft²total
276k ft² free · 1.1M ft² occupied
130k m² · 26k m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
About 138 MW of the utility feed is cooling, conversion, and house load.
Power cost
$53/kW·mo
6.7¢ industrial · 7.3¢ after PUE 1.09
- Per MW·year
- $640k
- This site · 562 MW
- $360M/yr
- 80 kW rack
- $4,265/mo
2.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $188M/yr less.
AEP Ohio · utility tariff × PUE, not colo list price.
- Redundancy
- N+2
- Opened
- 2025
- Renewable match
- 100%
- Rack density
- 80 kW
- PUE
- 1.091.00 ideal · 1.60 typical
- Power source
- AEP Ohio with 100% renewable matching.
Cooling
Plant
Direct-to-chip
Liquid
Deployed
Rack density
80 kW
H100-eq
680k
WUE
0.18 L/kWh
fleet avg · 2023 · 886k m³/yr at 562 MW
Operator fleet average applied to this hall — not a site meter. Meta 2023 Sustainability Report.
Direct-to-chip cold plates on MTIA and NVIDIA clusters. Open Rack / HPR liquid-busbar path toward 1 MW racks.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
1Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
New Albany, Ohio, United States
New Albany, Licking / Franklin County, OH
40.081°, -82.809° · North America
Tenants / users
Meta
Notes
Part of Meta's New Albany cluster, adjacent to Google's campus.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.