Operational
Hyperscale
Liquid cooling
Tier III

Meta Prometheus

Meta · New Albany Campus

IT live
562 MW
Remaining
138 MW
$ / kW·mo
$53
White space
1.1M ft²

Inventory

80% occupied

Power

700 MWcampus

138 MW to commission · 562 MW in use

White space

1.4M ft²total

276k ft² free · 1.1M ft² occupied

130k m² · 26k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live562 MW
Remaining138 MW
Utility feed700 MW
Campus / planned700 MW

About 138 MW of the utility feed is cooling, conversion, and house load.

Power cost

$53/kW·mo

6.7¢ industrial · 7.3¢ after PUE 1.09

Per MW·year
$640k
This site · 562 MW
$360M/yr
80 kW rack
$4,265/mo
3.2¢ cheapdear 22.4¢

2.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $188M/yr less.

AEP Ohio · utility tariff × PUE, not colo list price.

Redundancy
N+2
Opened
2025
Renewable match
100%
Rack density
80 kW
PUE
1.091.00 ideal · 1.60 typical
Power source
AEP Ohio with 100% renewable matching.

Cooling

Plant

Direct-to-chip

Liquid

Deployed

Rack density

80 kW

H100-eq

680k

WUE

0.18 L/kWh

fleet avg · 2023 · 886k m³/yr at 562 MW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. Meta 2023 Sustainability Report.

Direct-to-chip cold plates on MTIA and NVIDIA clusters. Open Rack / HPR liquid-busbar path toward 1 MW racks.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

New Albany, Ohio, United States

New Albany, Licking / Franklin County, OH

40.081°, -82.809° · North America

Tenants / users

Meta

Notes

Part of Meta's New Albany cluster, adjacent to Google's campus.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.