Expanding
Colocation
Liquid cooling
Tier III

Prime LAX01 Vernon

Prime Data Centers · LAX01

IT live
32 MW
Free to lease
3.8 MW
$ / kW·mo
$111
White space
221k ft²

Inventory

88% occupied

Power

32 MWlive

3.8 MW to lease · 28.2 MW in use

White space

221k ft²total

14k ft² free · 206k ft² occupied

20k m² · 1,312 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live32 MW
Free to lease3.8 MW
Utility feed60 MW
Campus / planned48 MW

About 28 MW of the utility feed is cooling, conversion, and house load.

Power cost

$111/kW·mo

12.2¢ industrial · 15.3¢ after PUE 1.25

Per MW·year
$1.3M
This site · 32 MW
$43M/yr
24 kW rack
$2,672/mo
3.2¢ cheapdear 22.4¢

3.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $32M/yr less.

SCE / CAISO · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2021
Renewable match
50%
Rack density
24 kW
PUE
1.251.00 ideal · 1.60 typical
Power source
SCE / LADWP adjacency. Dual 66 kV. CAISO.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

24 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Vernon, California, United States

Vernon, CA

34.004°, -118.230° · North America

Tenants / users

Lambda, cloud, enterprise

Notes

South LA wholesale. 21 MW reported Lambda lease Nov 2025. Complements Equinix LA. Constrained CAISO interconnection.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.