Expanding
Colocation
Air cooled
Tier III

Polcom Alwernia

Polcom · Alwernia

IT live
8 MW
Free to lease
1.1 MW
$ / kW·mo
$112
White space
94k ft²

Inventory

86% occupied

Power

8 MWlive

1.1 MW to lease · 6.9 MW in use

White space

94k ft²total

7,000 ft² free · 87k ft² occupied

8,710 m² · 650 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live8 MW
Free to lease1.1 MW
Utility feed15 MW
Campus / planned12 MW

About 7 MW of the utility feed is cooling, conversion, and house load.

Power cost

$112/kW·mo

11.6¢ industrial · 15.3¢ after PUE 1.32

Per MW·year
$1.3M
This site · 8 MW
$11M/yr
10 kW rack
$1,118/mo
3.2¢ cheapdear 22.4¢

3.6× the cheapest market (Iceland Landsvirkjun). Same IT load there is $7.8M/yr less.

Tauron · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2015
Renewable match
35%
Rack density
10 kW
Voltage
PUE
1.321.00 ideal · 1.60 typical
Power source
PGE / PSE. Dual 15 kV inlets plus on-site diesel. Coal-to-wind Polish grid.

Cooling

Plant

Free air

Liquid

Not deployed

Rack density

10 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Free-air economization in the shoulder seasons. Closed-loop dry coolers.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Alwernia, Lesser Poland, Poland

Alwernia, near Krakow

50.068°, 19.538° · Europe

Tenants / users

Government, enterprise, cloud

Notes

Krakow-adjacent Polcom campus. Southern Poland dual-site to Warsaw. Government and enterprise colo.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.