Planned
Colocation
Liquid cooling
Tier III

Pampa Energía Neuquén

Pampa Energía · Loma de la Lata

Planned IT
40 MW
Free to lease
40 MW
$ / kW·mo
$74
White space
125k ft²

Inventory

0% occupied

Power

40 MWlive

40 MW to lease · 0 MW in use

White space

125k ft²total

125k ft² free · occupied

12k m² · 12k m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live
Free to lease40 MW
Utility feed
Campus / planned40 MW

Power cost

$74/kW·mo

8.4¢ industrial · 10.1¢ after PUE 1.20

Per MW·year
$883k
This site · 40 MW
$35M/yr
30 kW rack
$2,208/mo
3.2¢ cheapdear 22.4¢

2.6× the cheapest market (Iceland Landsvirkjun). Same IT load there is $22M/yr less.

Argentina industrial · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2028
Renewable match
20%
Rack density
30 kW
PUE
1.201.00 ideal · 1.60 typical
Power source
Behind-the-meter at Pampa's Loma de la Lata gas plant. Pilot 20–40 MW.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

30 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Patagonia colo next to generation. Wind + thermal.

Network carriers

3

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

3

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Neuquén, Neuquén, Argentina

Loma de la Lata thermal plant, Neuquén, Patagonia

-38.950°, -68.430° · South America

Tenants / users

Undisclosed hyperscale interest

Notes

Patagonia data-center bet. Argentina is adding a second subsea landing to make the region viable. Early-stage.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.