Expanding
Hyperscale
Liquid cooling
Tier III

OVHcloud Strasbourg

OVHcloud · SBG

IT live
16 MW
Remaining
16 MW
$ / kW·mo
$89
White space
227k ft²

Inventory

50% occupied

Power

32 MWcampus

16 MW to commission · 16 MW in use

White space

455k ft²total

227k ft² free · 227k ft² occupied

42k m² · 21k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live16 MW
Remaining16 MW
Utility feed40 MW
Campus / planned32 MW

About 24 MW of the utility feed is cooling, conversion, and house load.

Power cost

$89/kW·mo

10.2¢ industrial · 12.2¢ after PUE 1.20

Per MW·year
$1.1M
This site · 16 MW
$17M/yr
12 kW rack
$1,072/mo
3.2¢ cheapdear 22.4¢

3.2× the cheapest market (Iceland Landsvirkjun). Same IT load there is $12M/yr less.

France Enedis / Grand Est · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2012
Renewable match
88%
Rack density
12 kW
Voltage
PUE
1.201.00 ideal · 1.60 typical
Power source
RTE / Enedis. Dual MV inlets plus on-site diesel. Nuclear-heavy French grid (ARENH).

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

12 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Rebuilt water-cooling stack after the 2021 SBG2 fire. HYR fire compartments.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Strasbourg, Grand Est, France

Rue de la Plaine des Bouchers, 67100 Strasbourg

48.573°, 7.752° · Europe

Tenants / users

OVHcloud dedicated, public cloud, Bare Metal

Notes

SBG campus rebuilt after the March 2021 fire. Remaining halls plus HYR-hardened replacements. Dual-site with Roubaix and Gravelines.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.