OVHcloud Gravelines
OVHcloud · GRA
- IT live
- 29 MW
- Remaining
- 51 MW
- $ / kW·mo
- $86
- White space
- 481k ft²
Inventory
36% occupiedPower
80 MWcampus
51 MW to commission · 29 MW in use
White space
1.3M ft²total
845k ft² free · 481k ft² occupied
123k m² · 79k m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
About 71 MW of the utility feed is cooling, conversion, and house load.
Power cost
$86/kW·mo
9.8¢ industrial · 11.8¢ after PUE 1.20
- Per MW·year
- $1M
- This site · 29 MW
- $30M/yr
- 16 kW rack
- $1,374/mo
3.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $20M/yr less.
France Enedis / Hauts-de-France · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2013
- Renewable match
- 92%
- Rack density
- 16 kW
- PUE
- 1.201.00 ideal · 1.60 typical
- Power source
- RTE / Enedis. Dual MV inlets plus on-site diesel. Nuclear-heavy French grid (ARENH).
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
16 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
In-house waterblocks plus free cooling. GRA3/GRA4 expansion under ICPE.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
1Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Gravelines, Hauts-de-France, France
Gravelines, Nord
50.987°, 2.128° · Europe
Tenants / users
OVHcloud dedicated, public cloud, GPU, Bare Metal
Notes
Largest OVH French campus. GRA1-3 live ~29 MW IT; GRA3.3/3.4/GRA4 add ~51 MW. Next to the Gravelines nuclear plant. HYR fire-hardening after Strasbourg 2021.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.