Operational
Colocation
Air cooled
Tier III

Orange Dakar DC

Orange Business · Dakar

IT live
4 MW
Free to lease
0.5 MW
$ / kW·mo
$164
White space
31k ft²

Inventory

88% occupied

Power

4 MWlive

0.5 MW to lease · 3.5 MW in use

White space

31k ft²total

3,750 ft² free · 28k ft² occupied

2,903 m² · 348 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live4 MW
Free to lease0.5 MW
Utility feed7.5 MW
Campus / planned6 MW

About 3.5 MW of the utility feed is cooling, conversion, and house load.

Power cost

$164/kW·mo

16¢ industrial · 22.4¢ after PUE 1.40

Per MW·year
$2M
This site · 4 MW
$7.8M/yr
6 kW rack
$981/mo
3.2¢ cheapdear 22.4¢

5.0× the cheapest market (Iceland Landsvirkjun). Same IT load there is $6.3M/yr less.

Senelec · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2016
Renewable match
20%
Rack density
6 kW
Voltage
PUE
1.401.00 ideal · 1.60 typical
Power source
National grid plus on-site generators. N+1 ride-through.

Cooling

Plant

Air / CRAH

Liquid

Not deployed

Rack density

6 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Chilled-water CRAH, N+1. Liquid-ready suites offered on newer campus halls.

Network carriers

3

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

2

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Dakar, Dakar, Senegal

Dakar, Senegal

14.717°, -17.468° · Africa

Tenants / users

Orange, enterprise, government, ACE cable

Notes

Francophone West Africa colo. ACE / 2Africa cable adjacency.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.