Operational
Hyperscale
Liquid cooling
Tier III

Oracle Cloud Turin

Oracle · eu-turin-1

IT live
8 MW
Remaining
8 MW
$ / kW·mo
$148
White space
96k ft²

Inventory

50% occupied

Power

16 MWcampus

8 MW to commission · 8 MW in use

White space

192k ft²total

96k ft² free · 96k ft² occupied

18k m² · 8,933 m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live8 MW
Remaining8 MW
Utility feed20 MW
Campus / planned16 MW

About 12 MW of the utility feed is cooling, conversion, and house load.

Power cost

$148/kW·mo

17.6¢ industrial · 20.2¢ after PUE 1.15

Per MW·year
$1.8M
This site · 8 MW
$14M/yr
16 kW rack
$2,364/mo
3.2¢ cheapdear 22.4¢

5.5× the cheapest market (Iceland Landsvirkjun). Same IT load there is $12M/yr less.

Italy industrial / Piedmont · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2023
Renewable match
55%
Rack density
16 kW
Voltage
PUE
1.151.00 ideal · 1.60 typical
Power source
Terna / Enel. Dual MV inlets plus on-site diesel. Gas-marginal Italian grid.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

16 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Turin, Piedmont, Italy

Greater Turin (AZ undisclosed)

45.078°, 7.682° · Europe

Tenants / users

Oracle Cloud

Notes

OCI Italy North. Pair to Google europe-west12 and Noovle on the Turin belt.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.