Expanding
Hyperscale
Liquid cooling
Tier III

Oracle Cloud Toronto

Oracle · ca-toronto-1

IT live
14 MW
Remaining
8 MW
$ / kW·mo
$89
White space
123k ft²

Inventory

64% occupied

Power

22 MWcampus

8 MW to commission · 14 MW in use

White space

193k ft²total

70k ft² free · 123k ft² occupied

18k m² · 6,517 m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live14 MW
Remaining8 MW
Utility feed27.5 MW
Campus / planned22 MW

About 13.5 MW of the utility feed is cooling, conversion, and house load.

Power cost

$89/kW·mo

10.6¢ industrial · 12.2¢ after PUE 1.15

Per MW·year
$1.1M
This site · 14 MW
$15M/yr
18 kW rack
$1,602/mo
3.2¢ cheapdear 22.4¢

3.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $10M/yr less.

Toronto Hydro / IESO · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2021
Renewable match
80%
Rack density
18 kW
PUE
1.151.00 ideal · 1.60 typical
Power source
Toronto Hydro / Hydro One / IESO. Dual feeds plus on-site diesel. Nuclear-plus-hydro Ontario mix.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

18 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Toronto, Ontario, Canada

Greater Toronto (AZ undisclosed)

43.680°, -79.400° · North America

Tenants / users

Oracle Cloud

Notes

OCI Canada Southeast / Toronto. Pair to Montréal. FastConnect on-ramps at Cologix and Equinix.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.