Operational
Hyperscale
Liquid cooling
Tier III

Oracle Cloud Tokyo

Oracle · Tokyo

IT live
20 MW
Remaining
10 MW
$ / kW·mo
$164
White space
83k ft²

Inventory

67% occupied

Power

30 MWcampus

10 MW to commission · 20 MW in use

White space

125k ft²total

42k ft² free · 83k ft² occupied

12k m² · 3,871 m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live20 MW
Remaining10 MW
Utility feed37.5 MW
Campus / planned30 MW

About 17.5 MW of the utility feed is cooling, conversion, and house load.

Power cost

$164/kW·mo

18.4¢ industrial · 22.4¢ after PUE 1.22

Per MW·year
$2M
This site · 20 MW
$39M/yr
20 kW rack
$3,277/mo
3.2¢ cheapdear 22.4¢

5.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $32M/yr less.

TEPCO extra-high voltage · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2019
Renewable match
50%
Rack density
20 kW
Voltage
PUE
1.221.00 ideal · 1.60 typical
Power source
TEPCO. Dual utility feeds. Seismically isolated (免震) building.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

20 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

8

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Tokyo, Tokyo, Japan

Tokyo region

35.680°, 139.760° · Asia

Tenants / users

Oracle Cloud, Japanese enterprises

Notes

OCI Tokyo region. Heavy enterprise and government mix.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.