Oracle Cloud Paris
Oracle · eu-paris-1
- IT live
- 24 MW
- Remaining
- 12 MW
- $ / kW·mo
- $87
- White space
- 188k ft²
Inventory
67% occupiedPower
36 MWcampus
12 MW to commission · 24 MW in use
White space
281k ft²total
94k ft² free · 188k ft² occupied
26k m² · 8,710 m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
About 21 MW of the utility feed is cooling, conversion, and house load.
Power cost
$87/kW·mo
10.4¢ industrial · 12¢ after PUE 1.15
- Per MW·year
- $1M
- This site · 24 MW
- $25M/yr
- 20 kW rack
- $1,746/mo
3.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $17M/yr less.
France Enedis / Ile-de-France · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2020
- Renewable match
- 90%
- Rack density
- 20 kW
- PUE
- 1.151.00 ideal · 1.60 typical
- Power source
- RTE / Enedis. Dual MV inlets plus on-site diesel. Nuclear-heavy French grid (ARENH).
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
20 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
1Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Paris, Île-de-France, France
Greater Paris (AZ undisclosed)
48.880°, 2.300° · Europe
Tenants / users
Oracle Cloud
Notes
OCI France Central. Dual-site with Marseille France South.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.