Oracle Cloud Mumbai
Oracle · Mumbai
- IT live
- 16 MW
- Remaining
- 8 MW
- $ / kW·mo
- $91
- White space
- 80k ft²
Inventory
67% occupiedPower
24 MWcampus
8 MW to commission · 16 MW in use
White space
120k ft²total
40k ft² free · 80k ft² occupied
11k m² · 3,716 m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
About 14 MW of the utility feed is cooling, conversion, and house load.
Power cost
$91/kW·mo
10.4¢ industrial · 12.5¢ after PUE 1.20
- Per MW·year
- $1.1M
- This site · 16 MW
- $17M/yr
- 15 kW rack
- $1,367/mo
3.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $12M/yr less.
MSEDCL / Tata Power · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2019
- Renewable match
- 30%
- Rack density
- 15 kW
- PUE
- 1.201.00 ideal · 1.60 typical
- Power source
- MSEDCL / Tata Power plus on-site generators. Dual utility feeds where available.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
15 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
5On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
1Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Mumbai, Maharashtra, India
Mumbai metro
19.070°, 72.940° · Asia
Tenants / users
Oracle Cloud
Notes
Oracle Cloud Infrastructure Mumbai region.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.