Expanding
Hyperscale
Liquid cooling
Tier III

Oracle Cloud Mexico Central

Oracle Cloud · Mexico Central

IT live
18 MW
Remaining
18 MW
$ / kW·mo
$89
White space
188k ft²

Inventory

50% occupied

Power

36 MWcampus

18 MW to commission · 18 MW in use

White space

375k ft²total

188k ft² free · 188k ft² occupied

35k m² · 17k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live18 MW
Remaining18 MW
Utility feed45 MW
Campus / planned36 MW

About 27 MW of the utility feed is cooling, conversion, and house load.

Power cost

$89/kW·mo

9.8¢ industrial · 12.3¢ after PUE 1.25

Per MW·year
$1.1M
This site · 18 MW
$19M/yr
20 kW rack
$1,789/mo
3.2¢ cheapdear 22.4¢

3.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $13M/yr less.

CFE Queretaro · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2022
Renewable match
30%
Rack density
20 kW
PUE
1.251.00 ideal · 1.60 typical
Power source
CFE. Dual 23 kV or 115 kV inlets plus on-site diesel. Mexican federal grid; interconnection queues are the constraint.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

20 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Queretaro, Queretaro, Mexico

Queretaro (Triara on-net)

20.613°, -100.394° · North America

Tenants / users

Oracle Cloud

Notes

OCI Mexico Central. On-net at Triara Queretaro with a Monterrey second AZ. Data-residency region, not a wholesale colo.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.