Oracle Cloud Mexico Central
Oracle Cloud · Mexico Central
- IT live
- 18 MW
- Remaining
- 18 MW
- $ / kW·mo
- $89
- White space
- 188k ft²
Inventory
50% occupiedPower
36 MWcampus
18 MW to commission · 18 MW in use
White space
375k ft²total
188k ft² free · 188k ft² occupied
35k m² · 17k m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
About 27 MW of the utility feed is cooling, conversion, and house load.
Power cost
$89/kW·mo
9.8¢ industrial · 12.3¢ after PUE 1.25
- Per MW·year
- $1.1M
- This site · 18 MW
- $19M/yr
- 20 kW rack
- $1,789/mo
3.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $13M/yr less.
CFE Queretaro · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2022
- Renewable match
- 30%
- Rack density
- 20 kW
- PUE
- 1.251.00 ideal · 1.60 typical
- Power source
- CFE. Dual 23 kV or 115 kV inlets plus on-site diesel. Mexican federal grid; interconnection queues are the constraint.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
20 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
1Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Queretaro, Queretaro, Mexico
Queretaro (Triara on-net)
20.613°, -100.394° · North America
Tenants / users
Oracle Cloud
Notes
OCI Mexico Central. On-net at Triara Queretaro with a Monterrey second AZ. Data-residency region, not a wholesale colo.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.