Operational
Hyperscale
Liquid cooling
Tier III

Oracle Cloud Johannesburg

Oracle · Johannesburg

IT live
12 MW
Remaining
6 MW
$ / kW·mo
$84
White space
60k ft²

Inventory

67% occupied

Power

18 MWcampus

6 MW to commission · 12 MW in use

White space

90k ft²total

30k ft² free · 60k ft² occupied

8,361 m² · 2,787 m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live12 MW
Remaining6 MW
Utility feed22.5 MW
Campus / planned18 MW

About 10.5 MW of the utility feed is cooling, conversion, and house load.

Power cost

$84/kW·mo

9.4¢ industrial · 11.5¢ after PUE 1.22

Per MW·year
$1M
This site · 12 MW
$12M/yr
15 kW rack
$1,256/mo
3.2¢ cheapdear 22.4¢

2.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $8M/yr less.

Eskom Gauteng · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2022
Renewable match
20%
Rack density
15 kW
PUE
1.221.00 ideal · 1.60 typical
Power source
Eskom plus on-site diesel and solar. Extended runtime sized for load-shedding ride-through.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

15 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

5

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Johannesburg, Gauteng, South Africa

Johannesburg metro

-26.080°, 28.120° · Africa

Tenants / users

Oracle Cloud

Notes

Oracle Cloud Infrastructure Johannesburg region.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.