Omnia Pecém / ByteDance
Omnia Data Centers · Pecém
- Planned IT
- 200 MW
- Remaining
- 200 MW
- $ / kW·mo
- $80
- White space
- 500k ft²
Inventory
0% occupiedPower
200 MWcampus
200 MW pipeline · 0 MW in use
White space
500k ft²total
500k ft² free · — occupied
46k m² · 46k m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
Power cost
$80/kW·mo
8.6¢ industrial · 11¢ after PUE 1.28
- Per MW·year
- $964k
- This site · 200 MW
- $193M/yr
- 40 kW rack
- $3,214/mo
2.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $121M/yr less.
Enel Ceará · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2027
- Renewable match
- 95%
- Rack density
- 40 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- Casa dos Ventos wind (Ceará and Piauí) plus Enel Ceará. 300 MW site load for 200 MW IT.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
40 kW
H100-eq
16k
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Direct-to-chip cold plates and rear-door HX. Designed for 40 kW-plus AI racks.
Network carriers
5On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Caucaia, Ceará, Brazil
Pecém industrial complex, Caucaia, Ceará (ZPE)
-3.626°, -38.845° · South America
Tenants / users
ByteDance / TikTok
Notes
ByteDance's largest campus outside China. 200 MW first phase (20 halls), 1 GW ambition. Pátria/Omnia build; Casa dos Ventos offtake. First DC in a Brazilian export-processing zone. Fortaleza went 15 to 215 MW on this one deal.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.