Under construction
Neocloud
Liquid cooling
Tier III

Omnia Pecém / ByteDance

Omnia Data Centers · Pecém

Planned IT
200 MW
Remaining
200 MW
$ / kW·mo
$80
White space
500k ft²

Inventory

0% occupied

Power

200 MWcampus

200 MW pipeline · 0 MW in use

White space

500k ft²total

500k ft² free · occupied

46k m² · 46k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live
Remaining200 MW
Utility feed
Campus / planned200 MW

Power cost

$80/kW·mo

8.6¢ industrial · 11¢ after PUE 1.28

Per MW·year
$964k
This site · 200 MW
$193M/yr
40 kW rack
$3,214/mo
3.2¢ cheapdear 22.4¢

2.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $121M/yr less.

Enel Ceará · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2027
Renewable match
95%
Rack density
40 kW
PUE
1.281.00 ideal · 1.60 typical
Power source
Casa dos Ventos wind (Ceará and Piauí) plus Enel Ceará. 300 MW site load for 200 MW IT.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

40 kW

H100-eq

16k

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Direct-to-chip cold plates and rear-door HX. Designed for 40 kW-plus AI racks.

Network carriers

5

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Caucaia, Ceará, Brazil

Pecém industrial complex, Caucaia, Ceará (ZPE)

-3.626°, -38.845° · South America

Tenants / users

ByteDance / TikTok

Notes

ByteDance's largest campus outside China. 200 MW first phase (20 halls), 1 GW ambition. Pátria/Omnia build; Casa dos Ventos offtake. First DC in a Brazilian export-processing zone. Fortaleza went 15 to 215 MW on this one deal.

Operator site