Expanding
Colocation
Liquid cooling
Tier III

ODATA SP01

ODATA (Aligned) · Santana de Parnaíba

IT live
20 MW
Free to lease
3.2 MW
$ / kW·mo
$101
White space
199k ft²

Inventory

84% occupied

Power

20 MWlive

3.2 MW to lease · 16.8 MW in use

White space

199k ft²total

18k ft² free · 181k ft² occupied

18k m² · 1,689 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live20 MW
Free to lease3.2 MW
Utility feed35 MW
Campus / planned28 MW

About 15 MW of the utility feed is cooling, conversion, and house load.

Power cost

$101/kW·mo

10.8¢ industrial · 13.8¢ after PUE 1.28

Per MW·year
$1.2M
This site · 20 MW
$24M/yr
12 kW rack
$1,211/mo
3.2¢ cheapdear 22.4¢

3.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $17M/yr less.

Enel SP · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2017
Renewable match
80%
Rack density
12 kW
PUE
1.281.00 ideal · 1.60 typical
Power source
Enel SP / CPFL. Dual feeds plus on-site diesel. Hydro-heavy Brazilian grid.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

12 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

5

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Santana de Parnaíba, São Paulo, Brazil

Santana de Parnaíba, Greater São Paulo

-23.445°, -46.918° · South America

Tenants / users

Hyperscale, cloud

Notes

ODATA's first hall. 20 MW across three phases (2017/2021/cloud-dedicated). Direct connect to SP03. Aligned DeltaFlow liquid retrofit in flight.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.