ODATA QR03 Queretaro
ODATA (Aligned) · QR03
- IT live
- 72 MW
- Free to lease
- 8.6 MW
- $ / kW·mo
- $92
- White space
- 1.2M ft²
Inventory
88% occupiedPower
72 MWlive
8.6 MW to lease · 63.4 MW in use
White space
1.2M ft²total
27k ft² free · 1.1M ft² occupied
109k m² · 2,508 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 303 MW of the utility feed is cooling, conversion, and house load.
Power cost
$92/kW·mo
9.8¢ industrial · 12.5¢ after PUE 1.28
- Per MW·year
- $1.1M
- This site · 72 MW
- $79M/yr
- 30 kW rack
- $2,747/mo
3.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $53M/yr less.
CFE Queretaro · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2025
- Renewable match
- 30%
- Rack density
- 30 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- CFE. Dual 23 kV or 115 kV inlets plus on-site diesel. Mexican federal grid; interconnection queues are the constraint.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
30 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Aligned Delta Cube air plus liquid-ready halls. First Mexican campus with Delta3.
Network carriers
5On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Los Cues, Queretaro, Mexico
PyME Industrial Park, Queretaro
20.548°, -100.251° · North America
Tenants / users
Hyperscale, cloud, AI wholesale
Notes
Largest Mexican hall. First building 72 MW IT live May 2025; campus design 300-400 MW across five buildings. CFE interconnection is the bottleneck.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.