Operational
Colocation
Liquid cooling
Tier III

ODATA QR02 Queretaro

ODATA (Aligned) · Queretaro

IT live
30 MW
Free to lease
3.6 MW
$ / kW·mo
$92
White space
156k ft²

Inventory

88% occupied

Power

30 MWlive

3.6 MW to lease · 26.4 MW in use

White space

156k ft²total

15k ft² free · 141k ft² occupied

15k m² · 1,394 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live30 MW
Free to lease3.6 MW
Utility feed37.5 MW
Campus / planned30 MW

About 7.5 MW of the utility feed is cooling, conversion, and house load.

Power cost

$92/kW·mo

9.8¢ industrial · 12.5¢ after PUE 1.28

Per MW·year
$1.1M
This site · 30 MW
$33M/yr
20 kW rack
$1,831/mo
3.2¢ cheapdear 22.4¢

3.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $22M/yr less.

CFE Queretaro · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2023
Renewable match
30%
Rack density
20 kW
PUE
1.281.00 ideal · 1.60 typical
Power source
CFE. Dual 23 kV or 115 kV inlets plus on-site diesel. Mexican federal grid; interconnection queues are the constraint.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

20 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

5

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Queretaro, Queretaro, Mexico

Parque Industrial Queretaro

20.589°, -100.390° · North America

Tenants / users

Hyperscale, cloud

Notes

Aligned/ODATA QR02. 30 MW. Second Mexican ODATA hall after QR01-era builds.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.