ODATA Mexico City

ODATA (Aligned) · Mexico City

IT live
18 MW
Free to lease
2.2 MW
$ / kW·mo
$97
White space
180k ft²

Inventory

88% occupied

Power

18 MWlive

2.2 MW to lease · 15.8 MW in use

White space

180k ft²total

10k ft² free · 170k ft² occupied

17k m² · 965 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live18 MW
Free to lease2.2 MW
Utility feed37.5 MW
Campus / planned30 MW

About 19.5 MW of the utility feed is cooling, conversion, and house load.

Power cost

$97/kW·mo

10.4¢ industrial · 13.3¢ after PUE 1.28

Per MW·year
$1.2M
This site · 18 MW
$21M/yr
16 kW rack
$1,555/mo
3.2¢ cheapdear 22.4¢

3.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $15M/yr less.

CFE CDMX · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2021
Renewable match
25%
Rack density
16 kW
PUE
1.281.00 ideal · 1.60 typical
Power source
CFE. Dual 23 kV or 115 kV inlets plus on-site diesel. Mexican federal grid; interconnection queues are the constraint.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

16 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

5

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Mexico City, Mexico City, Mexico

Mexico City

19.433°, -99.133° · North America

Tenants / users

Hyperscale, cloud, enterprise

Notes

CDMX ODATA wholesale. Complements KIO Santa Fe interconnection with Aligned density.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.