Under construction
Colocation
Liquid cooling
Tier III

ODATA BG03 Bogotá AI Campus

ODATA (Aligned) · Bogotá

Planned IT
120 MW
Free to lease
96 MW
$ / kW·mo
$96
White space
240k ft²

Inventory

20% occupied

Power

120 MWlive

96 MW to lease · 24 MW in use

White space

240k ft²total

192k ft² free · 48k ft² occupied

22k m² · 18k m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live
Free to lease96 MW
Utility feed
Campus / planned120 MW

Power cost

$96/kW·mo

11¢ industrial · 13.2¢ after PUE 1.20

Per MW·year
$1.2M
This site · 120 MW
$139M/yr
60 kW rack
$5,782/mo
3.2¢ cheapdear 22.4¢

3.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $98M/yr less.

Colombia industrial · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2026
Renewable match
70%
Rack density
60 kW
PUE
1.201.00 ideal · 1.60 typical
Power source
Colombian grid. US$1.08bn AI campus.

Cooling

Plant

Direct-to-chip

Liquid

Deployed

Rack density

60 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Direct-to-chip AI campus, 120 MW. Largest tracked Colombian AI hall.

Network carriers

5

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

3

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Tenjo, Cundinamarca, Colombia

Zona Franca, Tenjo, Cundinamarca

4.872°, -74.148° · South America

Tenants / users

Hyperscale, HPC

Notes

BG03 is Colombia's headline AI colo build.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.