ODATA BG02 Tenjo
ODATA (Aligned) · Bogotá
- Planned IT
- 24 MW
- Free to lease
- 19.2 MW
- $ / kW·mo
- $100
- White space
- 100k ft²
Inventory
20% occupiedPower
24 MWlive
19.2 MW to lease · 4.8 MW in use
White space
100k ft²total
80k ft² free · 20k ft² occupied
9,290 m² · 7,432 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$100/kW·mo
11¢ industrial · 13.8¢ after PUE 1.25
- Per MW·year
- $1.2M
- This site · 24 MW
- $29M/yr
- 20 kW rack
- $2,008/mo
3.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $20M/yr less.
Colombia industrial · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2026
- Renewable match
- 70%
- Rack density
- 20 kW
- PUE
- 1.251.00 ideal · 1.60 typical
- Power source
- Colombian grid. US$161m.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
20 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Liquid-ready wholesale next to BG03.
Network carriers
5On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
3Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Tenjo, Cundinamarca, Colombia
Zona Franca, Tenjo, Cundinamarca
4.870°, -74.150° · South America
Tenants / users
Hyperscale, cloud
Notes
24 MW Tenjo hall, originally targeting H2 2026.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.