Open Access DC Johannesburg
Open Access Data Centres · Johannesburg
- IT live
- 12 MW
- Free to lease
- 2.2 MW
- $ / kW·mo
- $91
- White space
- 68k ft²
Inventory
82% occupiedPower
12 MWlive
2.2 MW to lease · 9.8 MW in use
White space
68k ft²total
12k ft² free · 56k ft² occupied
6,334 m² · 1,140 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 18 MW of the utility feed is cooling, conversion, and house load.
Power cost
$91/kW·mo
9.4¢ industrial · 12.4¢ after PUE 1.32
- Per MW·year
- $1.1M
- This site · 12 MW
- $13M/yr
- 12 kW rack
- $1,087/mo
2.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $8.6M/yr less.
Eskom Gauteng · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2020
- Renewable match
- 20%
- Rack density
- 12 kW
- PUE
- 1.321.00 ideal · 1.60 typical
- Power source
- Eskom plus on-site diesel and solar. Extended runtime sized for load-shedding ride-through.
Cooling
Plant
Hybrid
Liquid
Not deployed
Rack density
12 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Indirect evaporative / IDEC, N+1. High-density liquid cabinets on request.
Network carriers
5On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Johannesburg, Gauteng, South Africa
Johannesburg, Gauteng
-26.180°, 28.000° · Africa
Tenants / users
Cloud, enterprise, networks
Notes
OADC wholesale colo. Third-largest ZA operator after Teraco and ADC.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.