Nxera DC Tuas
Nxera (Singtel) · Tuas
- IT live
- 58 MW
- Free to lease
- 2.3 MW
- $ / kW·mo
- $189
- White space
- 120k ft²
Inventory
96% occupiedPower
58 MWlive
2.3 MW to lease · 55.7 MW in use
White space
120k ft²total
3,840 ft² free · 116k ft² occupied
11k m² · 357 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 14.5 MW of the utility feed is cooling, conversion, and house load.
Power cost
$189/kW·mo
21.2¢ industrial · 25.9¢ after PUE 1.22
- Per MW·year
- $2.3M
- This site · 58 MW
- $131M/yr
- 30 kW rack
- $5,664/mo
6.6× the cheapest market (Iceland Landsvirkjun). Same IT load there is $112M/yr less.
Singapore EMA · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2026
- Renewable match
- 35%
- Rack density
- 30 kW
- PUE
- 1.221.00 ideal · 1.60 typical
- Power source
- SP Group. Dual feeds plus on-site generators. Capacity still gated by IMDA/EDB CFA awards.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
30 kW
H100-eq
6k
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Singapore's largest published direct-to-chip deployment at opening. Hybrid CRAH on standard cages.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Singapore, Singapore, Singapore
Tuas, Singapore
1.296°, 103.637° · Asia
Tenants / users
Hyperscale, AI, cloud, subsea — Singtel CLS
Notes
Opened Feb 2026. 58 MW AI-ready, eight storeys, 120,000 sq ft. Only Singapore hyperconnected DC integrated with a cable landing station. More than 90 percent pre-leased. Takes Nxera Singapore to 120 MW.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.