Under construction
Colocation
Air cooled
Tier III

NXDATA-3 Bucharest

NXDATA · Pipera

Planned IT
5 MW
Free to lease
5 MW
$ / kW·mo
$114
White space
31k ft²

Inventory

0% occupied

Power

5 MWlive

5 MW to lease · 0 MW in use

White space

31k ft²total

31k ft² free · occupied

2,903 m² · 2,903 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live
Free to lease5 MW
Utility feed
Campus / planned5 MW

Power cost

$114/kW·mo

11.8¢ industrial · 15.6¢ after PUE 1.32

Per MW·year
$1.4M
This site · 5 MW
$6.8M/yr
10 kW rack
$1,137/mo
3.2¢ cheapdear 22.4¢

3.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $5M/yr less.

OPCOM · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2026
Renewable match
55%
Rack density
10 kW
Voltage
PUE
1.321.00 ideal · 1.60 typical
Power source
Transelectrica. Dual 20 kV inlets. Nuclear (Cernavoda), hydro, and wind mix.

Cooling

Plant

Air / CRAH

Liquid

Not deployed

Rack density

10 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Chilled-water CRAH, N+1. Isolated hot aisles. Not an AI factory unless noted.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Bucharest, Bucharest, Romania

Bulevardul Dimitrie Pompeiu 8, Bucharest

44.481°, 26.117° · Europe

Tenants / users

Cloud, enterprise, networks

Notes

Third NXDATA hall, 5 MW total / 3 MW IT, four halls. Dual 20 kV. Targeted 2026 near OTP airport.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.