NXDATA-2 Bucharest

NXDATA · Pipera

IT live
4 MW
Free to lease
0.6 MW
$ / kW·mo
$114
White space
35k ft²

Inventory

86% occupied

Power

4 MWlive

0.6 MW to lease · 3.4 MW in use

White space

35k ft²total

3,889 ft² free · 31k ft² occupied

3,226 m² · 361 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live4 MW
Free to lease0.6 MW
Utility feed5 MW
Campus / planned4 MW

About 1 MW of the utility feed is cooling, conversion, and house load.

Power cost

$114/kW·mo

11.8¢ industrial · 15.6¢ after PUE 1.32

Per MW·year
$1.4M
This site · 4 MW
$5.5M/yr
8 kW rack
$910/mo
3.2¢ cheapdear 22.4¢

3.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $4M/yr less.

OPCOM · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2009
Renewable match
55%
Rack density
8 kW
Voltage
PUE
1.321.00 ideal · 1.60 typical
Power source
Transelectrica. Dual 20 kV inlets. Nuclear (Cernavoda), hydro, and wind mix.

Cooling

Plant

Air / CRAH

Liquid

Not deployed

Rack density

8 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Chilled-water CRAH, N+1. Isolated hot aisles. Not an AI factory unless noted.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Bucharest, Bucharest, Romania

Pipera, 500 m from NXDATA-1

44.479°, 26.121° · Europe

Tenants / users

Networks, cloud, enterprise

Notes

Second NXDATA hall, commissioned 2009. Pair to NX-1 for Bucharest metro diversity.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.