Operational
Colocation
Liquid cooling
Tier III

NTT Taipei

NTT GDC · Taipei

IT live
10 MW
Free to lease
1.1 MW
$ / kW·mo
$91
White space
63k ft²

Inventory

89% occupied

Power

10 MWlive

1.1 MW to lease · 8.9 MW in use

White space

63k ft²total

6,875 ft² free · 56k ft² occupied

5,806 m² · 639 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live10 MW
Free to lease1.1 MW
Utility feed20 MW
Campus / planned16 MW

About 10 MW of the utility feed is cooling, conversion, and house load.

Power cost

$91/kW·mo

9.2¢ industrial · 12.4¢ after PUE 1.35

Per MW·year
$1.1M
This site · 10 MW
$11M/yr
10 kW rack
$907/mo
3.2¢ cheapdear 22.4¢

2.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $7.1M/yr less.

Taipower · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2017
Renewable match
25%
Rack density
10 kW
Voltage
PUE
1.351.00 ideal · 1.60 typical
Power source
Taipower. Dual feeds. Seismic design.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

10 kW

H100-eq

WUE

0.72 L/kWh

fleet avg · 2024 · 63k m³/yr at 10 MW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. NTT DATA GDC 2025 Sustainability Report (FY2024).

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

5

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

5

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Taipei, Taipei, Taiwan

Taipei, Taiwan

25.060°, 121.540° · Asia

Tenants / users

Cloud, enterprise, NTT Cloud

Notes

NTT Taipei wholesale. Japan–Taiwan DR path.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.