NTT NAV3 Airoli
NTT GDC · NAV Airoli
- IT live
- 24 MW
- Free to lease
- 4.3 MW
- $ / kW·mo
- $103
- White space
- 136k ft²
Inventory
82% occupiedPower
24 MWlive
4.3 MW to lease · 19.7 MW in use
White space
136k ft²total
25k ft² free · 112k ft² occupied
13k m² · 2,280 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 6 MW of the utility feed is cooling, conversion, and house load.
Power cost
$103/kW·mo
10.2¢ industrial · 14.1¢ after PUE 1.38
- Per MW·year
- $1.2M
- This site · 24 MW
- $30M/yr
- 12 kW rack
- $1,233/mo
3.2× the cheapest market (Iceland Landsvirkjun). Same IT load there is $20M/yr less.
MSEDCL · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2016
- Renewable match
- 30%
- Rack density
- 12 kW
- PUE
- 1.381.00 ideal · 1.60 typical
- Power source
- MSEDCL / Tata Power plus on-site generators. Dual utility feeds where available.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
12 kW
H100-eq
—
WUE
0.72 L/kWh
fleet avg · 2024 · 151k m³/yr at 24 MW
Operator fleet average applied to this hall — not a site meter. NTT DATA GDC 2025 Sustainability Report (FY2024).
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
5Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Navi Mumbai, Maharashtra, India
Airoli, Navi Mumbai
19.160°, 73.003° · Asia
Tenants / users
Hyperscale, cloud
Notes
Third NAV building. Combined Airoli campus is NTT's largest India cluster.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.