NTT NAV1 Airoli
NTT GDC · NAV Airoli
- IT live
- 18 MW
- Free to lease
- 3.2 MW
- $ / kW·mo
- $103
- White space
- 125k ft²
Inventory
82% occupiedPower
18 MWlive
3.2 MW to lease · 14.8 MW in use
White space
125k ft²total
23k ft² free · 103k ft² occupied
12k m² · 2,090 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 4.5 MW of the utility feed is cooling, conversion, and house load.
Power cost
$103/kW·mo
10.2¢ industrial · 14.1¢ after PUE 1.38
- Per MW·year
- $1.2M
- This site · 18 MW
- $22M/yr
- 8 kW rack
- $822/mo
3.2× the cheapest market (Iceland Landsvirkjun). Same IT load there is $15M/yr less.
MSEDCL · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2012
- Renewable match
- 30%
- Rack density
- 8 kW
- PUE
- 1.381.00 ideal · 1.60 typical
- Power source
- MSEDCL / Tata Power plus on-site generators. Dual utility feeds where available.
Cooling
Plant
Air / CRAH
Liquid
Not deployed
Rack density
8 kW
H100-eq
—
WUE
0.72 L/kWh
fleet avg · 2024 · 114k m³/yr at 18 MW
Operator fleet average applied to this hall — not a site meter. NTT DATA GDC 2025 Sustainability Report (FY2024).
Chilled-water CRAH. Tropical wet-bulb limits evaporative; liquid-ready high-density cages on newer halls.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
5Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Navi Mumbai, Maharashtra, India
Airoli, Navi Mumbai
19.158°, 73.001° · Asia
Tenants / users
Hyperscale, cloud, enterprise — NTT Cloud
Notes
First NTT Navi Mumbai building. Seven-building NAV campus.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.