NTT London 1 Dagenham
NTT GDC · Dagenham
- IT live
- 64 MW
- Free to lease
- 6.4 MW
- $ / kW·mo
- $168
- White space
- 320k ft²
Inventory
90% occupiedPower
64 MWlive
6.4 MW to lease · 57.6 MW in use
White space
320k ft²total
32k ft² free · 288k ft² occupied
30k m² · 2,973 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 16 MW of the utility feed is cooling, conversion, and house load.
Power cost
$168/kW·mo
18.4¢ industrial · 23¢ after PUE 1.25
- Per MW·year
- $2M
- This site · 64 MW
- $129M/yr
- 15 kW rack
- $2,518/mo
5.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $107M/yr less.
England industrial · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2016
- Renewable match
- 80%
- Rack density
- 15 kW
- PUE
- 1.251.00 ideal · 1.60 typical
- Power source
- UK Power Networks plus operator renewable PPAs. Dual utility feeds.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
15 kW
H100-eq
—
WUE
0.72 L/kWh
fleet avg · 2024 · 404k m³/yr at 64 MW
Operator fleet average applied to this hall — not a site meter. NTT DATA GDC 2025 Sustainability Report (FY2024).
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
7On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
5Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Dagenham, England, United Kingdom
Dagenham, East London
51.540°, 0.142° · Europe
Tenants / users
Hyperscale, cloud, enterprise
Notes
NTT's flagship UK wholesale campus, ~64 MW. Among the largest single UK operating buildings.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.