Expanding
Colocation
Liquid cooling
Tier III

NTT Jakarta 3 Cibitung

NTT GDC · Cibitung

IT live
15 MW
Free to lease
2.7 MW
$ / kW·mo
$89
White space
282k ft²

Inventory

82% occupied

Power

15 MWlive

2.7 MW to lease · 12.3 MW in use

White space

282k ft²total

14k ft² free · 268k ft² occupied

26k m² · 1,254 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live15 MW
Free to lease2.7 MW
Utility feed56.3 MW
Campus / planned45 MW

About 41.3 MW of the utility feed is cooling, conversion, and house load.

Power cost

$89/kW·mo

9.2¢ industrial · 12.1¢ after PUE 1.32

Per MW·year
$1.1M
This site · 15 MW
$16M/yr
15 kW rack
$1,330/mo
3.2¢ cheapdear 22.4¢

2.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $10M/yr less.

PLN · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2023
Renewable match
20%
Rack density
15 kW
PUE
1.321.00 ideal · 1.60 typical
Power source
PLN. Dual municipal feeds plus on-site generators.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

15 kW

H100-eq

WUE

0.72 L/kWh

fleet avg · 2024 · 95k m³/yr at 15 MW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. NTT DATA GDC 2025 Sustainability Report (FY2024).

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

5

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Cibitung, West Java, Indonesia

Cibitung, Bekasi

-6.262°, 107.107° · Asia

Tenants / users

Hyperscale, cloud, NTT Cloud

Notes

Cibitung campus. 15 MW first building, 45 MW / 18,000 m2 at full build. 30 km from Jakarta 2.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.