Operational
Colocation
Liquid cooling
Tier III

NTT Hemel Hempstead 3

NTT GDC · Hemel Hempstead

IT live
12 MW
Free to lease
1.2 MW
$ / kW·mo
$172
White space
68k ft²

Inventory

90% occupied

Power

12 MWlive

1.2 MW to lease · 10.8 MW in use

White space

68k ft²total

6,818 ft² free · 61k ft² occupied

6,334 m² · 633 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live12 MW
Free to lease1.2 MW
Utility feed15 MW
Campus / planned12 MW

About 3 MW of the utility feed is cooling, conversion, and house load.

Power cost

$172/kW·mo

18.4¢ industrial · 23.6¢ after PUE 1.28

Per MW·year
$2.1M
This site · 12 MW
$25M/yr
12 kW rack
$2,063/mo
3.2¢ cheapdear 22.4¢

5.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $20M/yr less.

England industrial · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2015
Renewable match
80%
Rack density
12 kW
Voltage
PUE
1.281.00 ideal · 1.60 typical
Power source
UK Power Networks plus operator renewable PPAs. Dual utility feeds.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

12 kW

H100-eq

WUE

1.20 L/kWh

this site · 2024 · 126k m³/yr at 12 MW

0 dry2.50 evaporative

Measured at this building. NTT Hemel Hempstead 3 reverse-osmosis project (Jun 2023–Jul 2024).

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

7

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

5

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Hemel Hempstead, England, United Kingdom

Hemel Hempstead, Hertfordshire

51.756°, -0.468° · Europe

Tenants / users

Cloud, enterprise

Notes

Third Hemel hall. High-density upgrade path.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.