Operational
Colocation
Liquid cooling
Tier III

NTT GDC Tokyo 6 Inzai

NTT GDC · Inzai

IT live
40 MW
Free to lease
4 MW
$ / kW·mo
$166
White space
200k ft²

Inventory

90% occupied

Power

40 MWlive

4 MW to lease · 36 MW in use

White space

200k ft²total

20k ft² free · 180k ft² occupied

19k m² · 1,858 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live40 MW
Free to lease4 MW
Utility feed50 MW
Campus / planned40 MW

About 10 MW of the utility feed is cooling, conversion, and house load.

Power cost

$166/kW·mo

17.8¢ industrial · 22.8¢ after PUE 1.28

Per MW·year
$2M
This site · 40 MW
$80M/yr
15 kW rack
$2,495/mo
3.2¢ cheapdear 22.4¢

5.6× the cheapest market (Iceland Landsvirkjun). Same IT load there is $65M/yr less.

TEPCO Chiba · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2016
Renewable match
25%
Rack density
15 kW
PUE
1.281.00 ideal · 1.60 typical
Power source
TEPCO. Dual utility feeds. Seismically isolated (免震) building.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

15 kW

H100-eq

WUE

0.72 L/kWh

fleet avg · 2024 · 252k m³/yr at 40 MW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. NTT DATA GDC 2025 Sustainability Report (FY2024).

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

9

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

5

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Inzai, Chiba, Japan

Inzai, Chiba

35.830°, 140.145° · Asia

Tenants / users

Hyperscale, cloud

Notes

Second NTT Inzai hyperscale hall. Campus fiber to Tokyo 5/7.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.