Operational
Colocation
Liquid cooling
Tier III

NTT GDC Tokyo 5 Inzai

NTT GDC · Inzai

IT live
40 MW
Free to lease
4 MW
$ / kW·mo
$169
White space
227k ft²

Inventory

90% occupied

Power

40 MWlive

4 MW to lease · 36 MW in use

White space

227k ft²total

23k ft² free · 205k ft² occupied

21k m² · 2,111 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live40 MW
Free to lease4 MW
Utility feed50 MW
Campus / planned40 MW

About 10 MW of the utility feed is cooling, conversion, and house load.

Power cost

$169/kW·mo

17.8¢ industrial · 23.1¢ after PUE 1.30

Per MW·year
$2M
This site · 40 MW
$81M/yr
12 kW rack
$2,027/mo
3.2¢ cheapdear 22.4¢

5.6× the cheapest market (Iceland Landsvirkjun). Same IT load there is $67M/yr less.

TEPCO Chiba · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2013
Renewable match
25%
Rack density
12 kW
PUE
1.301.00 ideal · 1.60 typical
Power source
TEPCO. Dual utility feeds. Seismically isolated (免震) building.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

12 kW

H100-eq

WUE

0.72 L/kWh

fleet avg · 2024 · 252k m³/yr at 40 MW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. NTT DATA GDC 2025 Sustainability Report (FY2024).

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

9

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

5

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Inzai, Chiba, Japan

Inzai, Chiba

35.828°, 140.142° · Asia

Tenants / users

Hyperscale, cloud, enterprise

Notes

Original NTT Inzai hyperscale building. Core of Japan's largest colo cluster.

Operator site