NTT GDC Tokyo TKY12
NTT GDC · Shiroi / Inzai
- Planned IT
- 200 MW
- Free to lease
- 200 MW
- $ / kW·mo
- $148
- White space
- 400k ft²
Inventory
0% occupiedPower
200 MWlive
200 MW to lease · 0 MW in use
White space
400k ft²total
400k ft² free · — occupied
37k m² · 37k m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$148/kW·mo
17.6¢ industrial · 20.2¢ after PUE 1.15
- Per MW·year
- $1.8M
- This site · 200 MW
- $355M/yr
- 100 kW rack
- $14,775/mo
5.5× the cheapest market (Iceland Landsvirkjun). Same IT load there is $290M/yr less.
TEPCO Chiba · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2028
- Renewable match
- 50%
- Rack density
- 100 kW
- PUE
- 1.151.00 ideal · 1.60 typical
- Power source
- TEPCO. Dedicated substation on the Inzai–Shiroi corridor. Six-building campus.
Cooling
Plant
Direct-to-chip
Liquid
Deployed
Rack density
100 kW
H100-eq
—
WUE
0.72 L/kWh
fleet avg · 2024 · 1.3M m³/yr at 200 MW
Operator fleet average applied to this hall — not a site meter. NTT DATA GDC 2025 Sustainability Report (FY2024).
Campus-scale liquid-ready AI factory. Six buildings, ~200 MW IT. Announced April 2026.
Network carriers
7On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
5Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Shiroi, Chiba, Japan
Shiroi, Chiba
35.794°, 140.060° · Asia
Tenants / users
Hyperscale, AI clouds
Notes
Japan's largest announced NTT campus. Combined Shiroi/Inzai NTT GDC pipeline ~250 MW with TKY11.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.